Design-build project to restore the Apra Harbor Wastewater treatment Plant (AHWWTP) to Its original design capacity and operational capability and to upgrade the process components and equipment to meet current wastewater treatment standards.
AIC provided extensive mechanical, electrical, instrumentation and control systems for the facility. Civil work was substantial with mass excavation and backfill, force main, sewer lines, water lines and asphalt pavement.
Client: NAVFAC
Location: Apra Harbor Naval Base Guam
Value: $ 8,360,000
Completed date: November 15, 2011
Category: Government